EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
phowe
-
Listing for Category : empennage
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (415)
Research
- (1)
Workshop
- (2)
Empennage
- (2)
Fuselage
- (71)
Firewall
- (11)
Tail Feathers
- (37)
Wings
- (86)
-
Wing root Gap Seal
-
Hung 1 Flap
-
Temporary Hung Wing...
-
Ailerons
-
Matched drilled...
-
Mounted Wings
-
Ailerons, Flaps and...
-
Installed Return...
-
Wing Fuel Tank...
-
Balanced Rebuilt...
-
Pitot Tube
-
Balancing the Right...
-
Remanufactured Right...
-
Finished balancing...
-
Balance left Aileron
-
Wing to Fuselage...
-
Left Wing Strut Fairing
-
Wing Tips
-
Wing Tips
-
Strut Fairing
-
Wing to Strut Fairing
-
Aerosport Wing Tips
-
New Wing tips
-
Reattached the strut...
-
Strut Mounting brackets
-
Removed wings
-
Tighten all the...
-
Hung the wings
-
Struts
-
Replaced incorrect...
-
Attached Wing Tips
-
Wing tips - Project...
-
Wing tips - Project...
-
Wing tips - Project...
-
Wing tips - Project...
-
Wing tips - Project...
-
Wing tips - Project...
-
Wing tip - part from...
-
Wing Struts
-
Wing tips - Project...
-
Pro Sealed fuel cap...
-
Rivet Left wing...
-
Installed fuel tanks...
-
Wing tips - Project...
-
Fuel Tank
-
Continued working on...
-
Fuel Tanks
-
Wing tips
-
Fuel Tanks
-
Recreated Pitot tube...
-
Right Fuel Tank
-
Pitot Support
-
Finished off left...
-
Finished Skins Right...
-
Attaching skin to...
-
Transferred right...
-
Assembled wing jig
-
Gap seal...
-
Installed gap seal...
-
Finished ailerons...
-
Ailerons and flaps
-
Aileron and Flaps
-
Wings
-
Attached bellcranks...
-
Work on left wing
-
Riveted Ribs to Spars
-
Riveted Hinge...
-
Cut out wing shaping...
-
laid out ribs and...
-
Left wing strut...
-
Installed strut...
-
Installed strut...
-
Drilled and...
-
Optional landing lights
-
Locating wing ribs...
-
Optional Landing...
-
Bell Crank
-
Finished Riveting of...
-
Right wing spars
-
Aileron and Flap...
-
Began Work on...
-
Front and Back Spar.
-
Shaped the flaps and...
-
Cut the tabs off of...
-
Pulled and...
Controls
- (11)
Avionics
- (30)
Lighting
- (13)
Instrument Panel
- (6)
Landing Gear
- (16)
Engine
- (30)
Propeller
- (7)
Fuel System
- (18)
Interior Finish
- (46)
Rigging
- (6)
Paint / Decals
- (10)
Inspection
Tools
MISC
- (12)
Builder Name:
Philip Howe
-
Project:
Rans - S-21 Outbound
-
VIEW REPORTS
Total Hours:
1711.75
Total Flight Time:
6
Total Expense:
N/A
Start/Last Date:
Oct 19, 2020 - No Finish Date
Engine:
Rotax 915is
Propeller:
Whirlwind
Panel:
Dynon
Friendly URL:
https://eaabuilderslog.org?s=phowe
Home or Last Project Picture
Feb 16, 2022
Removed Vertical Stab and rudder
- (7 hours)
Category: Empennage
We had filed the bushings on the vertical stab to get the rudder to swing better. We rethought this and ordered new bushings. removed the old ones and ordered new ones. We added the rubber bottom strip that we had missed the first time. I don't enjoy putting this on and off. Definitely a 2 person job.
Photo Feb 16, 1 07 14 PM.jpg
Photo Feb 16, 1 07 17 PM.jpg
Photo Feb 16, 1 27 55 PM.jpg
Photo Feb 16, 9 32 07 AM.jpg
Photo Feb 16, 9 32 18 AM.jpg
Nov 18, 2021
Worked on the optional Horizontal Stab grab handle
- (1 hour)
Category: Empennage
We went back and worked on this part left over from the early stages. Riveted the doublers in and bought replacement tubes at I wanted longer handles. We will finish later.
Photo Nov 18, 8 18 51 AM.jpg
Photo Nov 18, 8 18 57 AM.jpg
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.